Of each redevelopment project
Summary

We comment on the future of five blocks where redevelopment is carried out. In addition, you can see summary about land readjustment project.

Shibuya Hikarie

Base that disseminates information on behalf of Shibuya with musical theater largest in the country, event hall and creative space

Landmark of Shibuya who recorded the number of the more than 20 million visitors in opening of business one year. We find person-adaptive space having difficulty with return at high quake resistance, disaster and contribute to the formation of urban space that there is little environment load by approach to advanced environment improvement.

In - ground the fifth floor under the ground on the third floor, in the sixth floor, the seventh floor, in the eighth floor, in the ninth floor, in the eleventh floor ... the 16th floor, the 17th floor ... the 34th floor is comprised creative space "8/" (bee) which can touch design and art casually in office musical theater "Tokyu theater Aube" largest domestically large size event hall "Hikarie hall" eating and drinking floor "dining 6" "TABLE 7" commercial facilities "ShinQs" (sinks) which Tokyu Department Store runs.

Not only we have high earthquake performance, but also "Shibuya Hikarie" finds about 5,500m² as space that is hard to come home, and can accommodate person temporarily occurring at the time of disaster. Spare power supply for about 72 hours is in hall and can use some restrooms at the time of disaster, and storage of 13,000 meals of drinking water, food is done, too.

Furthermore, we create urban space which by promoting inflection of natural energy and introduction of high efficiency energy system, advanced approach to environmental improvement including tree planting, considered environment. We plan reduction of CO2 discharge and relaxation of heat island effect and contribute to the formation of city with a little environmental load.

Shibuya Hikarie

Summary of building

Project implementing body

Astringent juice Arata Tani culture block project promotion meeting
Tokyu, Tokyo Metro, TOHO Ltd., Tanaka Building, Kae Building company

The location

2-21-1, Shibuya, Shibuya-ku, Tokyo

Use

Commerce, office, cultural facility, parking lot others

Plottage

About 9,640m²

Deferred floor space

About 144,000m²

Number of floors

34 stories above the ground and 4 stories underground

Height

182.5m

Design

Nikken Sekkei Ltd., Tokyu Architects & Engineers joint venture

The opening of business

2012

Shibuya stream

Area that attracts creative worker having memory of former Toyoko Line Shibuya Station

We reuse elevated part to walker deck and take in design of barrel roof and are on a large scale compound facilities where memory of home of former Toyoko Line Shibuya Station, track ruins and the neighboring districts remains. The adjacent Shibuya River is reproduced by public-private cooperation and becomes oasis of new Shibuya.

As place where next-generation industry is brought up

There are not event hall, border of job and play including commercial facilities in about 200 hotels, low-rise building part in office, middle class part in lofty part, and facilities supporting creative worker gather.

We have former Toyoko Line Shibuya Station for memory and change dynamically

We take in a part designs such as reuse or barrel roof of elevated part on walker deck crossing Route 246 in order to have former Toyoko Line Shibuya Station that contributed to development of Shibuya after the opening of business of 1927 as memory.

We utilize local resources and bring about turnout

In the Shibuya River which has been isolated by public-private cooperation by turnout of town, we utilize clear stream revival water by public-private cooperation and regain current and maintain green promenade for 600m and open space of turnout along the river and provide space of waterside with moisture.

Summary of building

Project implementing body

Tokyu, place of Toyoko Line adjacency block incarnation

The location

3-21-3, Shibuya, Shibuya-ku, Tokyo

Use

Office, store, hotel, hall, parking lot

Plottage

About 7,100m²

Deferred floor space

About 116,700m²

Number of floors

35 stories above the ground and 4 stories underground

Height

About 180m

Design

Tokyu Architects & Engineers

Design architects

Kazuhiro Kojima + Kazuko Akamatsu/coelacanth and associates (CAt)

The opening of business

2018

Environmental maintenance of the Shibuya River
(open space and waterscape facilities)

We push forward reproduction of the Shibuya River and maintenance of open space by public-private cooperation to development of building in Shibuya stream.
By inflection of exception system of river private use, gate of Shibuya 3 and "Inari Bridge open space" where it is maintain symbol of Shibuya 3 and two open spaces of "King Bridge open space" where it is in total on the King Hashigami style side on the Inari Hashimoto style side who is river site as open space of turnout.
In addition, we maintain waterscape facilities called "wall fountain" utilizing clear stream revival water between these open spaces and provide good waterside space with turnout and moisture visually audibly. Furthermore, we maintain green promenade "reverse treat" for about 600m and form green and network of water by building a breakwater tree planting due to ivy, row of trees of Takagi.

Environmental maintenance of the Shibuya River

Open space image to become symbol of Shibuya 3

Environmental maintenance of the Shibuya River

Turnout image of wall fountain and Shibuya riverside store

Environmental maintenance of the Shibuya River

Maintenance image of green promenade and Shibuya River for about 600m

Shibuya scramble
Square

Model project of city reproduction around terminal station

Shibuya scramble square located on the direct top of Shibuya Station that is terminal station on behalf of Japan is comprised of (central ridge, West Wing) for stage II for stage I (East Wing) and has both office & commercial facilities largest in the outskirts district and comprises facilities, sightseeing support facilities disseminating information attracting person of prospects facilities having the roof prospects space largest in Japan cowound facilities promoting development of creative contents industry, next town and aims at international competitiveness reinforcement of Shibuya.
It was completed in 2019 for stage I (East Wing). Central ridge, West Wing plans the opening of business of 2027.

We always aim at realization of people and town which continues attracting attention from the world

We have both office (floor space about 70,000 m² for rent) and commercial facilities (store area about 70,000 m²) becoming largest in around Shibuya Station district and always play a central role to realize town which continues attracting attention with people from the world.

We aim at realization of comfortable town by security

This plan cooperates with "Shibuya Station block land readjustment project" and railroad improvement business mutually and plans reinforcement of traffic node and improvement of walker in convenience, reinforcement of disaster protection function.

We aim at reinforcement of international competitiveness

We maintain facilities and sightseeing support facilities disseminating information attracting person of facilities promoting innovation and next town of creative contents industry such as IT, picture, fashion and aim at reinforcement of international competitiveness of town.

Summary of building

Project implementing body

Tokyu, East Japan Railway Company., Tokyo Metro

The location

2-24-12, Shibuya, Shibuya-ku, Tokyo

Use

Office, store, fine-view facilities, parking lot

Plottage

About 15,300m²

Deferred floor space

About 276,000m²

Height

East Wing: The center ridge 47 stories above the ground and 7 stories underground: West Wing 10 stories above the ground and 2 stories underground: 13 stories above the ground and 5 stories underground

Design

Around Shibuya Station maintenance plan joint venture
(Nikken Sekkei Ltd., Tokyu Architects & Engineers, East Japan Railway architecture design, metro development)

Design architects

Nikken Sekkei Ltd., Kengo Kuma architecture urban design office, SANAA office

The opening of business

Stage I (East Wing): 2019 stage II (central ridge, West Wing): 2027 (plan)

Around east exit, west exit station maintenance image

①East exit station square (basement) east exit Station basement open space
②The east exit Urban core
③The second floor of the east exit deck
④The east exit, the west exit national highway deck
⑤The west exit station square
⑥The west exit taxi pool (basement)
⑦The west exit Urban core
⑧The north and south free passage

Around east exit, west exit station maintenance image

This drawing is radioisotope image and may be changed in future.

Shibuya Fukura's

Compound facilities which take landmark of the Shibuya Station west exit as base of urban sightseeing

It is constructed compound facilities in offices commercial by happiness of people in "(blow up) to blow up" in concept. Roof terrace "SHIBU NIWA" and industry advance support facilities "business airport" which can overlook town of Shibuya are added to office, the 17th floor, and, in the first floor, in the second floor, the eighth floor, the 17th floor, the 18th floor, the 16th floor contributes to turnout of town commercial facilities "Tokyu plaza Shibuya" suggesting mature lifestyle "bus terminal" which airport limousine runs in as facilities which are based, and accept wide various places of urban sightseeing from the ninth floor "sightseeing support facilities" with art center function.

Role as public contribution function

We maintain Urban core, Shibuya Station and Dogenzaka notification deck linking multilayered urban infrastructure with barrier-free up and down to connect neighboring areas. We realize walker network which is easy to move this building as hub right to left or up and down to Shibuya Station and neighboring areas. In addition, we maintain local disposal of goods ground "ESSA" for the purpose of reduction of road disposal of goods on the second floor under the ground and realize town planning comfortable to walk in of neighboring areas.

Shibuya Fukura's

Urban core

Summary of building

Project implementing body

Shibuya Fukura's condominium form of organization

Participation union member

Tokyu Land Corporation

The location

1-2-3, Dogenzaka, Shibuya-ku, Tokyo

Use

Office, store, parking lot

Plottage

About 3,330m²

Deferred floor space

About 58,970m²

Number of floors

18 stories above the ground and 4 stories underground

Height

About 103m

Design

(design architects) Tezuka Building Res. Inst.
(master architects) Nikken Sekkei Ltd.
(design, control) SHIMIZU Corporation registered architect of the first class office

The opening of business

2019

Shibuya Station Sakuragaoka Exit District

To new Shibuya filled with new charm

This project is redevelopment business arranging the enforcement area of about 2.6ha to spread through the southwestern part of Shibuya Station integrally. It is important project to take part of urban infrastructure maintenance of Shibuya Station loop, and by maintaining walker, roadway network under the ground, convenience of town plans excursion-related improvement. In addition, aiming at international competitiveness reinforcement of town, we introduce international medical facilities, company support facilities and it is hard to come home and maintains temporary stay facilities of person and by strengthening disaster protection function, realize new Shibuya filled with new charm.

Improvement in charm of town

Access from the outskirts to this project improves by this project connecting to walker deck connected to new wicket of JR Shibuya Station, walker deck of the Route 246 sky. In addition, we maintain walker network such as walker deck to connect between Urban core and block which are vertical line of flow. At the same time, we maintain neighboring block and connected roadway network under the ground and plan improvement of convenience, comfort of town.

Function to contribute to reinforcement of international competitiveness

By this project, we add to office, house of medium lofty part, commercial facilities of low-rise building part and introduce international medical facilities, service apartment, child care support facilities supporting foreign firm, foreign business people and plan international competitiveness reinforcement of town by maintaining company support facilities supporting upbringing of venture business, company.

Summary of building

Project implementing body

Shibuya Station Sakuragaoka Exit District city area redevelopment association

Participation union member

Tokyu Land Corporation

The location

123, Sakuragaokacho, Shibuya-ku, Tokyo, 124, the 125th (lot number)

Use

Office, store, house, church, parking lot

Plottage

About 16,970㎡

Deferred floor space

About 254,700㎡

Number of floors

A block: 39 stories above the ground and 4 stories underground
B block: 30 stories above the ground and 1 story underground
C block: The fourth floor above the ground

Height

A block: About 180m
B block: About 127m
C block: About 16m

Design

Design architects

Nobuaki Furuya
Nazca registered architect of the first class office
Nikken Sekkei Ltd.

Basics, actual engineering

Nikken Sekkei Ltd.
Nazca registered architect of the first class office
Nikken housing system
Ookayama building design research institute

Change actual engineering

Kashima, TODA joint venture

We are going to be completed

2023

Shibuya Station block land division
About rearranging business

Let alone ground maintenance of town, comfortable turnout is born security from basement

We change flow of the Shibuya River flowing through basement of Shibuya Station and perform re-maintenance of facilities and create the Shibuya River with turnout and moisture. In addition, we maintain the east exit basement open space for the formation of comfortable open space space, reinforcement of traffic nodule function by security and we maintain big rainwater tank in the east exit station square basement and aim at strong town for flood.

About Shibuya Station block land readjustment project

About Shibuya Station block land readjustment project

To river with turnout, moisture

We change flow of the Shibuya River flowing through basement of Shibuya Station and perform re-maintenance of facilities.

About Shibuya Station block land readjustment project

Comfortable open space that connects station and town

We create comfortable walking space by security and plan nodule functional enhancement with a variety of traffic.

About Shibuya Station block land readjustment project

We do not lose in water. Town reliable safely

In the station square basement, we maintain big rainwater tank. We realize town resisting flood.

Summary of building

Joint enforcer

Tokyu incorporated administrative agency Urban Renaissance Agency

The ground incarnation

Tokyu East Japan Railway Company. Tokyo Metro

The enforcement period

... 2026

Shibuya Mark City

Shibuya Mark City joined Shibuya Area Management Council in June, 2020.

Platform in Shibuya west exit district

It is compound facilities which this museum which reached the 21st anniversary of the opening in 2021 gathered, and they will carry role to connect Homo sapiens, thing, thing of town with as platform (base) in Shibuya west area on one by hotel, office, commercial facilities, railroad, function of express bus terminal in future.

It is support by daily life of all people living to base in Shibuya

We think about service, function, store which worker using Shibuya every day, neighboring inhabitants really want and aim at having by snuggling up to daily life of the various places, do your life more wealthily.

Summary of building

Project implementing body

Tokyo Metro
Tokyu
Keio Corporation

The location

1-1-12-1, Dogenzaka, Shibuya-ku, Tokyo others

Use

Office, store, parking lot

Plottage

14, 420.37㎡

Building area

13, 256.08㎡

Deferred floor space

138, 620.49㎡

Structure

Steel-frame building, some steel frames steel reinforced concrete construction

Number of floors

Yeast (hotel ridge) the second floor of the basement, the 25th floor above the ground, tower 2 stories
Waist (office ridge) the first floor of the basement, the 23rd floor above the ground, tower 3 stories

Design

Nihonsekkei, Tokyu Architects & Engineers design joint venture

The opening of business

2000